Recently, the Testing Center of CEEG received its Laboratory Accreditation Certificate (Registration No.: CNAS L21724) after passing the evaluation by
1. Why is a ZnO surge arrester installed between the power capacitor and its breaker? A ZnO surge arrester is installed to prevent overvoltage caused
Since 2003, the Global Renewable Energy Attractiveness Index (RECAI) has been published biannually, ranking the top 40 markets worldwide based on the
The development and innovation in green transformer technology are reflected in various products, including three-dimensional (3D) wound core transfor
As global attention on energy and environmental sustainability continues to rise, the power industry is facing unprecedented challenges and opportunit
1. Introduction to PV Step-up Transformers Photovoltaic (PV) power generation converts light energy into electrical energy through the photoelectric e
When designing large-capacity power transformers, a key decision is whether to use a three-phase three-limb core or a three-phase five-limb core. This
In grid-connected photovoltaic (PV) power generation systems, the step-up transformer is one of the critical components. Optimizing transformer select
Recently, the second phase of the 4 million-ton pelletizing project at Tosyali in Algeria, contracted by Sinosteel International, successfully receive
Coal mining is a crucial source of energy supply in China, and the requirements for transformers in coal mines are exceptionally high. These transform